Alloa Reservoir and Pumping Station, Caledon, Ontario

ROMAG is currently constructing the Alloa Reservoir and Pumping Station. The project will serve water distribution zones 6 and 7 for Peel Region. Alloa is a two cell reservoir with a capacity of 35 ML. The project includes a 14,300 m3 emergency reservoir overflow and storm water management pond. The work also includes groundwater pumping station, a sanitary pumping station, electrical services including twin emergency standby generators, and feedermains for each Zone connecting to transmission mains located on Mayfield Road.


Gallery