Airport Road Reservoir & Surge Building Expansion
Location: Brampton, Ontario
ROMAG successfully completed the Airport Road Reservoir and Surge Building expansion in Brampton.
The project involves the construction of a new 20ML reservoir which will be interconnected with the existing reservoir and the expansion of the existing Surge Building including the installation of a new 225m3surge arrestor tank and related piping systems.
Modifications to the existing reservoir include structural repairs to the existing cells, inlet tower and channels.
The work also includes installation of yard piping, expanding the existing stormwater management facilities, installing a mechanically stabilized earth retaining wall, electrical, instrumentation and control systems to the existing pumping station and all restoration work.
All Projects
Completed Projects
-
Airport Road Reservoir & Surge Building Expansion
-
Alloa Reservoir and Pumping Station
-
Caledon East Well #2 & #3 Pumping Station
-
Caledon East Well #4 Pumping Station
-
Clarkson Wastewater Treatment Plant, Contract 2-2 Solids Upgrade
-
Dundas East Wastewater Pumping Station, Oakville, Ontario
-
G.E. Booth (Lakeview) Aeration Tank Expansion
-
G.E. Booth (Lakeview) Mercury Reduction System
-
G.E. Booth WWTP, Ash Piping Replacement
-
G.E. Booth WWTP, Primary Clarifier Expansion
-
G.E. Booth WWTP, Primary Inlet Conduit Contract 1A
-
Grimsby Water Storage System
-
Lockview Combined Sewer Overflow Storage Tank
-
Malton Four Corners Stormwater Pumping Station and Castlemore Wastewater Pumping Station Upgrades
-
Nonquon Water Pollution Control Plant Expansion
-
Port Colborne Water Treatment Plant Upgrade
-
Smithville Reservoir and Pumping Station
-
Tullamore Pumping Station & Reservoir
-
Welland Water Treatment Plant Phase 1 Upgrades