Alloa Reservoir and Pumping Station
Location: Caledon, Ontario
ROMAG completed the Alloa Reservoir and Pumping Station which will serve water distribution zones 6 and 7 for Peel Region.
Alloa is a two cell reservoir with a capacity of 35 ML.The project includes a 14,300 m3 emergency reservoir overflow and storm water management pond.
The work also includes groundwater pumping station, a sanitary pumping station, electrical services including twin emergency standby generators, and feedermains for each zone connecting to transmission mains located on Mayfield Road.
All Projects
Completed Projects
-
Airport Road Reservoir & Surge Building Expansion
-
Alloa Reservoir and Pumping Station
-
Caledon East Well #2 & #3 Pumping Station
-
Caledon East Well #4 Pumping Station
-
Clarkson Wastewater Treatment Plant, Contract 2-2 Solids Upgrade
-
Dundas East Wastewater Pumping Station, Oakville, Ontario
-
G.E. Booth (Lakeview) Aeration Tank Expansion
-
G.E. Booth (Lakeview) Mercury Reduction System
-
G.E. Booth WWTP, Ash Piping Replacement
-
G.E. Booth WWTP, Primary Clarifier Expansion
-
G.E. Booth WWTP, Primary Inlet Conduit Contract 1A
-
Grimsby Water Storage System
-
Lockview Combined Sewer Overflow Storage Tank
-
Malton Four Corners Stormwater Pumping Station and Castlemore Wastewater Pumping Station Upgrades
-
Nonquon Water Pollution Control Plant Expansion
-
Port Colborne Water Treatment Plant Upgrade
-
Smithville Reservoir and Pumping Station
-
Tullamore Pumping Station & Reservoir
-
Welland Water Treatment Plant Phase 1 Upgrades