G.E. Booth WWTP, Primary Inlet Conduit Contract 1A

Location: Mississauga, Ontario

ROMAG has completed the construction of a new cast-in-place concrete Primary Inlet Conduit to convey preliminary treated wastewater from the Grit Facility to Plant 1 and 2. The Conduit is provided with isolation and flow control gates, channel aeration system, and odorous air collection system. Additional works includes, demolishing existing tunnels and buildings, retrofit stormwater collection system to suit new conduit, retrofit the existing high voltage electrical loop and Realignment of the existing Jim Tovey Lakeview Conservation Area (JTLCA) roadway to suit the construction of the new conduit.