G.E. Booth WWTP, Primary Inlet Conduit Contract 1A
Location: Mississauga, Ontario
ROMAG has completed the construction of a new cast-in-place concrete Primary Inlet Conduit to convey preliminary treated wastewater from the Grit Facility to Plant 1 and 2. The Conduit is provided with isolation and flow control gates, channel aeration system, and odorous air collection system. Additional works includes, demolishing existing tunnels and buildings, retrofit stormwater collection system to suit new conduit, retrofit the existing high voltage electrical loop and Realignment of the existing Jim Tovey Lakeview Conservation Area (JTLCA) roadway to suit the construction of the new conduit.
All Projects
Completed Projects
-
Airport Road Reservoir & Surge Building Expansion
-
Alloa Reservoir and Pumping Station
-
Caledon East Well #2 & #3 Pumping Station
-
Caledon East Well #4 Pumping Station
-
Clarkson Wastewater Treatment Plant, Contract 2-2 Solids Upgrade
-
Dundas East Wastewater Pumping Station, Oakville, Ontario
-
G.E. Booth (Lakeview) Aeration Tank Expansion
-
G.E. Booth (Lakeview) Mercury Reduction System
-
G.E. Booth WWTP, Ash Piping Replacement
-
G.E. Booth WWTP, Primary Clarifier Expansion
-
G.E. Booth WWTP, Primary Inlet Conduit Contract 1A
-
Grimsby Water Storage System
-
Lockview Combined Sewer Overflow Storage Tank
-
Malton Four Corners Stormwater Pumping Station and Castlemore Wastewater Pumping Station Upgrades
-
Nonquon Water Pollution Control Plant Expansion
-
Port Colborne Water Treatment Plant Upgrade
-
Smithville Reservoir and Pumping Station
-
Tullamore Pumping Station & Reservoir
-
Welland Water Treatment Plant Phase 1 Upgrades