Grimsby Water Storage System

Location: Grimsby, Ontario

ROMAG has completed the construction of the Grimsby Water Storage System. The project included construction of a new dual cell 16,700 cubic meter litre reservoir, associated disinfection system, emergency power system, valve chambers and water distribution mains. Romag also performed modifications to the existing water storage system (piping, valves, flow meters and monitoring system), which was  undertaken in restricted time frames, after the new system is online.

New equipment includes:

  • 900 linear meters of 500mm CPP watermain
  • One 100 KW / 600V / 3 phase Emergency Diesel Generator
  • One 150 KVA 27.6KV Outdoor Transformer
  • One pair of 300 Litre Sodium Hypochlorite Tanks c/w Injection & Sampling subsystems
  • Miscellaneous yard and sanitary piping
  • Building Services and SCADA