ROMAG successfully completed the Tullamore Pumping Station and Reservoir which involved the construction of a pumping station, a 48 ML reservoir and an administration building.
The pumping station with a peak flow rate in excess of 1,500 L/s includes the supply and installation of seven (7) Horizontal Split Case pumps (Zone 5 low lift and Zone 6 high lift), service room, generator room, MCC room and loading bay.
The administration building includes five offices, lunch room, board room, washrooms, control room, storage room and server room.
The site work includes construction of emergency flow pond, utility structure, on-site sewage system, dewatering pumping station, yard piping and chambers including site grading, fencing, landscaping and access road.
The work also includes instrumentation and control, new power supply and all related HVAC work, as well as start-up and commissioning.
All Projects
Completed Projects
-
Airport Road Reservoir & Surge Building Expansion
-
Alloa Reservoir and Pumping Station
-
Caledon East Well #2 & #3 Pumping Station
-
Caledon East Well #4 Pumping Station
-
Clarkson Wastewater Treatment Plant, Contract 2-2 Solids Upgrade
-
Dundas East Wastewater Pumping Station, Oakville, Ontario
-
G.E. Booth (Lakeview) Aeration Tank Expansion
-
G.E. Booth (Lakeview) Mercury Reduction System
-
G.E. Booth WWTP, Ash Piping Replacement
-
G.E. Booth WWTP, Primary Clarifier Expansion
-
G.E. Booth WWTP, Primary Inlet Conduit Contract 1A
-
Grimsby Water Storage System
-
Lockview Combined Sewer Overflow Storage Tank
-
Malton Four Corners Stormwater Pumping Station and Castlemore Wastewater Pumping Station Upgrades
-
Nonquon Water Pollution Control Plant Expansion
-
Port Colborne Water Treatment Plant Upgrade
-
Smithville Reservoir and Pumping Station
-
Tullamore Pumping Station & Reservoir
-
Welland Water Treatment Plant Phase 1 Upgrades